上海419魔都后花园2023

 Nylon drag chain
 News Center
Your location: Home page - News Center - technical knowledge

What should be paid attention to in the installation of nylon drag chain?

2022-07-23 10:05:30
second

1. It is suitable for reciprocating movement, and can pull and protect the built-in cable, oil pipe, air pipe, water pipe, etc.

2. Drag chain has been widely used in CNC machine tools. Drag chain can be divided into bridge type drag chain, fully enclosed drag chain and semi enclosed drag chain according to different use environments and requirements. Purpose and characteristics of plastic drag chain Electronic equipment, stone machinery, glass machinery, fire fighting machinery, overweight transportation equipment, door and window machinery, injection molding machine, manipulator, automated warehouse, etc.

3. Each section of the drag chain can be opened for easy installation and maintenance. Low noise, wear resistance, and high-speed movement.

  Nylon drag chain

   Nylon drag chain Installation precautions:

1. If the cables are installed in layers in the traction chain. When the traction chain changes direction, the cables will not block each other.

2. Make sure that the cable can move with the traction chain without force.

3. When the cable is installed on the traction chain. Do not twist or curl. The cable needs to be rotated and opened from the cable reel and cannot be pulled out from the top in a twisted way. Before installation, the cable shall be braided straight and shall not be twisted. The cable shall have 10% allowance of the whole length so that it will not be twisted when placed in the traction chain.

4. If there are hydraulic pipes in the traction chain. It can expand or contract under foot load. The operation of the traction chain system will not be interrupted.

5. To maintain the balance of the traction chain during operation. It is necessary to ensure that the weight of the cable is evenly distributed, with the heavier cable on both sides and the lighter cable in the middle. All cables need to be firmly fixed at one end of the traction chain to ensure that the cable can be moved to the other end together with other equipment.

6. When flat cable and round cable are mixed in the traction chain. Cables need to be installed loosely. Fixtures shall be installed on both sides of the cable to avoid circular cables of different sizes. If space is limited. If it is necessary to place one cable on top of the other, a bulkhead and shelf shall be installed.

7. Cables shall be installed together with bulkheads, gaskets or fixtures with separate holes. So that the cable can move freely in the traction chain. The gap between the cable and the gasket shall be at least 10% of the cable diameter.

8. In order to lay multi-core high flexible cables with an outer diameter of less than 10 mm, we recommend the use of conduit. The conduit needs to be loosely fixed. Then connect the conduit to the traction chain. The cross-sectional area of the conduit needs to be greater than the sum of all cable sections. For free moving pipes, conduit or baffle shall be installed.


Recent browsing